Industry Insight: Common Causes of Construction Delays – And How to Avoid Them

Writer: ewson0
ewson0
Sep 21
3 min read

Industry Expert Insights: Part Two (2 minute read)


Following on from our first Industry Insight, where we looked at getting the most from your contractor, we're continuing our series of short, practical topics designed to share some of the things we've learnt from more than 30 years in the construction industry.


This time, we're looking at construction delays – what commonly causes them and, more importantly, what you can do to reduce the chances of them happening on your project.

The reality is that not every delay can be avoided. Construction involves a lot of different people, materials, suppliers and moving parts, and sometimes something completely unexpected happens. But there are plenty of potential delays that can be avoided with the right planning and by choosing the right contractor in the first place.


  1. Start with a clear plan.


One of the biggest causes of delays is starting work before everything is properly agreed and ready to go. If drawings are still changing, specifications haven't been finalised, materials haven't been ordered or important decisions are still outstanding, there's a good chance the programme will be affected.


It can be tempting to get work started as quickly as possible, but spending time getting everything in place beforehand can save considerably more time further down the line. Before work begins, make sure you understand what is being delivered, what decisions you need to make and whether there is anything that could hold the project up.


  1. Ask about materials and lead times.


If your project involves specialist, bespoke or less commonly available materials, find out how long they are likely to take and when they need to be ordered. A material that looks straightforward on paper may have a surprisingly long lead time, and discovering that after work has started can leave everyone waiting.


A good contractor should be able to identify potential issues like this early and advise you where something needs to be ordered in advance or where an alternative might be worth considering.


  1. Be aware of the impact of changes.


It's not unusual for a client to want to make a change once they can actually see the project taking shape. Sometimes an unexpected issue also means the original plans need to be altered. The important thing is to understand what that change could mean before agreeing to it.


A seemingly small change can affect other parts of the project, including materials, costs, other trades and the overall programme. Always ask your contractor what impact a proposed change will have rather than assuming it can simply be fitted in without affecting anything else.


  1. Communication.


You should know who is managing your project, how often you'll receive updates and what will happen if something doesn't go according to plan. If your contractor identifies a potential problem, you want to know about it early – not when the deadline has already been missed.


The same applies to decisions you need to make. If your contractor is waiting for you to approve something, choose a material or confirm a specification, a delay in making that decision could have a knock-on effect on the rest of the programme. Keeping communication open works both ways.


  1. How will your contractor manage the programme?


Before your project starts, make sure you know who will coordinate the different trades, how are subcontractors scheduled and what happens if one stage takes longer than expected? An experienced contractor should have a clear approach to managing these moving parts and should be able to explain it to you.


Finally, don't be afraid to ask what could potentially go wrong before the project starts. It might not be the most exciting conversation to have, but understanding the potential risks gives you the opportunity to plan for them. Ask about long-lead materials, access, deliveries, other contractors working on site, approvals and anything else that could affect the programme.


After all, the best time to identify a potential delay is before it becomes one!


You can't always control what happens during a construction project, but you can control how well prepared you are. Choosing a contractor with the right experience, making sure the project is properly planned, keeping communication open and making decisions promptly can all help keep things moving.


And if something does go wrong, don't panic. A good contractor should be able to explain what has happened, what the options are and what needs to happen next.


Our advice? Don't just ask a contractor how long your project will take. Ask them what could make it take longer – and what they will do to prevent that happening. That's often where you find out how well a project is really going to be managed.


Keep an eye out for the next Ewson Industry Insight, where we'll be sharing another practical lesson from our experience in construction – “How to prepare your site before work begins for larger projects”.

 
 
 